Manara - Qatar Research Repository
Browse
10.1002_net.21967.pdf (1.87 MB)

Integrating production scheduling and transportation procurement through combinatorial auctions

Download (1.87 MB)
journal contribution
submitted on 2023-03-15, 08:04 and posted on 2023-03-16, 06:24 authored by Chefi Triki, Sujan Piya, Liang‐Liang Fu

This study uses the winner determination problem (WDP) to integrate auction transportation procurement with decisions related to production scheduling. The basic problem arises when a manufacturer has to clear a combinatorial auction to decide whether to cover transportation needs by using the in-house fleet or to procure transportation through auction. Thus, the manufacturer should include an additional decision level by integrating the WDP with production scheduling to gain efficiency and achieve savings in the logistics system. To the best of our knowledge, this is the first time production and transportation procurement problems are being solved simultaneously in an integrated manner. The study proposes a mathematical formulation and develops two heuristic approaches for solving the integrated problem. Extensive computational experiments and sensitivity analyses are reported to validate the model, assess the performance of the heuristics, and show the effect of integration on total cost.

Other Information

Published in: Networks
License: http://creativecommons.org/licenses/by/4.0/
See article on publisher's website: http://dx.doi.org/10.1002/net.21967

Funding

Open Access funding provided by the Qatar National Library.

History

Language

  • English

Publisher

Wiley

Publication Year

  • 2020

License statement

This Item is licensed under the Creative Commons Attribution 4.0 International License.

Institution affiliated with

  • Hamad Bin Khalifa University
  • College of Science and Engineering - HBKU

Usage metrics

    College of Science and Engineering - HBKU

    Licence

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC